The long anticipated new oak floor has now arrived and made a very good feature stacked up in the front room for several weeks but now it is finally time to start laying the new floor.
The first job is to remove the remaining old laminate floor that only covered half the room and prepare the room ready for the new floor fitting.
With the room stripped bare ready for the flooring we have time to screed the old floor and make it level ready for the new floor. With the concrete down all we need to do now is wait for this to dry and then the floor can go down.